Highgate Road, Unit C
Birmingham
255 Highgate Road, Birmingham, B11 1XE
£50,000 per annum
2896 sq. ft.
The accommodation, when completed, will provide 3, separate, self contained, ground floor commercial outlets, completed to shell.
Glazed frontages. Concrete floor structures.
It will be for the tenant occupier to undertake all “fit out works”.
However, the developer will provide adequate toilet facilitiesKey features
•Prominent position, situated at the inter-section of Highgate Road & Ladypool Road
•Located at the heart of Birmingham’s famous “Balti Triangle”
•Within close proximity to the major, Crescent Development
•Forming part of a 4-storey structure – residential above
•Completion date, circa second quarter, 2026
Brochure
Related properties
Birmingham
140 Alum Rock Road, Birmingham, B8 1HU
- Retail
- 8470 sq. ft.
- To Let
£100,000 per annum
POTENTIAL RESTAURANT/RETAIL PREMISES
8,470 sq.ft/786.85 sq.m
• Prime location in terms of the Alum Rock Road/local community.
• Prominent position/extensive frontage.
• Former church – immense character.
• Excellent footfall/substantial traffic flow.
• Surrounding areas are densely populated residential.
• Suitable to be utilised on the basis of retail or restaurant.
Birmingham
2051 Coventry Road, Birmingham, B26 3DY
- Retail
- 1600 sq. ft.
- To Let
£20,000 per annum
GROUND FLOOR RESTAURANT/RETAIL FACILITY.
1,600 sq.ft/148.64 sq.m
• Consent approved – 70 cover restaurant facility.
• Prior to completion, the landlord will install a new glazed shop frontage.
• Direct frontage onto the main Coventry Road (A45 – arterial route – considerable traffic flow).
• Communal forecourt parking.
• Access road to the rear (deliveries).
• Located directly opposite an Aldi Supermarket.
• Circa, 6 miles south east of Birmingham City Centre.
Birmingham
255 Highgate Road, Birmingham, B11 1XE
- Retail
- 3000 sq. ft.
- To Let
£60,000 per annum
•Prominent position, situated at the inter-section of Highgate Road & Ladypool Road
•Located at the heart of Birmingham’s famous “Balti Triangle”
•Within close proximity to the major, Crescent Development
•Forming part of a 4-storey structure – residential above
•Completion date, circa second quarter, 2026