Highgate Road, Unit A
Birmingham
255 Highgate Road, Birmingham, B11 1XE
£60,000 per annum
3000 sq. ft.
The accommodation, when completed, will provide 3, separate, self contained, ground floor commercial outlets, completed to shell.
Glazed frontages. Concrete floor structures.
It will be for the tenant occupier to undertake all “fit out works”.
However, the developer will provide adequate toilet facilitiesKey features
•Prominent position, situated at the inter-section of Highgate Road & Ladypool Road
•Located at the heart of Birmingham’s famous “Balti Triangle”
•Within close proximity to the major, Crescent Development
•Forming part of a 4-storey structure – residential above
•Completion date, circa second quarter, 2026
Brochure
Related properties
Birmingham
97-99 Alcester Road, Moseley, Birmingham, B13 8DD
- Retail
- 4340 sq. ft.
- To Let
£40,000 per annum
**UNDER OFFER**
Planning consent approved to convert
the ground floor to a public house and
the upper floors on the basis of a
boutique hotel.
• Prominent position, fronting Alcester
Road (A453 – main arterial route),
situated at the heart of “Moseley
Village”.
• Opposite Sainsbury’s and Co-op.
• Off Street car parking to the rear.
Birmingham
60-62 Constitution Hill, Part Enterprise House, Ground Floor, Birmingham, B19 3JT
- Retail
- 5000 sq. ft.
- To Let
£25,000 per annum
•Direct frontage onto Constitution Hill – main arterial route – considerable traffic flow.
•Circa, 0.25 of a mile from Birmingham City Centre (short walking distance).
•Currently configurated on the basis of escape rooms.
•Suitable to be utilised on the basis of a variety of uses – retail/showroom/restaurant.
•St Paul’s Metro/tram Station are nearby.
Birmingham
255 HighgateRoad, Birmingham, B11 1XE
- Retail
- 2368 sq. ft.
- To Let
£40,000 per annum
•Prominent position, situated at the inter-section of Highgate Road & Ladypool Road
•Located at the heart of Birmingham’s famous “Balti Triangle”
•Within close proximity to the major, Crescent Development
•Forming part of a 4-storey structure – residential above
•Completion date, circa second quarter, 2026